CNC Machining and Precision Manufacturing Solutions
From prototype to production, we help you source and manufacture precision-machined components with vetted factories, tight tolerances, and scalable capacity.
Get Your Quote
Tell us what you need and get 3 real quotes.
What to Send With Your RFQ
To get you an accurate, apples-to-apples quote fast, include your drawings (PDF + STEP/IGES) with tolerances and finish notes, plus any critical features (gauge, alloy, hardness, weld specs). If you have them, share a target price and demand forecast (MOQ/EAU) so we can pair you with the right-capability plant. Note any packaging/labeling requirements, as well as the QA documents you need (FAI/PPAP/CMM). Finally, add your ship-to ZIP, and we'll return a 48-hour landed-cost model and a vetted factory shortlist.

Why Teams Pick Importivity for Metal & CNC
Tight tolerances, on time
We pair parts to shops that already run your spec.
Real QA, real deadlines
First articles approved, pre-ship inspections included.
Transparent landed costs
Side-by-side CN vs VN vs MX in 48 hours.
One accountable team
U.S. leads plus on-site QC. No hand-offs, no mystery.
Ready to get started?
Get matched with vetted factories and a transparent, tariff-aware cost plan.
Talk to a Sourcing ExpertRegion by Results, Not Hype
Transparent cost, duty, lead time, and risk across CN/VN/MX/US, so your first articles pass and production holds spec.
China
- Deepest bench for complex CNC plus finishes (anodize, e-coat, zinc, passivation)
- Scale pricing for multi-op parts and assemblies
- Mature supply chains and tooling; fast fixture iteration
Vietnam
- Excellent sheet metal and assembly value; CNC capability improving quickly
- Tariff relief vs China with competitive labor and solid QA culture
- Great for enclosures, brackets, and light fab with paint/powder
Mexico
- Nearshore speed and easier on-site visits (same/similar time zones)
- Strong for heavier-gauge fab, frames, weldments, and final assembly
- Truck lanes cut transit time; lower inventory risk vs ocean
United States
- Best for urgent prototypes, regulated parts, and IP-sensitive builds
- Shortest lead times and easiest change control with local teams
- Ideal for low-volume/high-mix or tight DFM collaboration
Our Sourcing Process
Fast, transparent, and tariff-aware; we align on specs, surface the right factories, and move you from DFM to production without surprises.
Part & Intent Review (Day 0-1)
We digest your prints, target price, demand, and risks.
Factory Shortlist (By 48h+)
2-3 shops that already run similar parts.
DFM & Quote Pack (Day 2-5)
Feedback, risks, firm lead times, landed cost by lane.
First Articles (Weeks 2-4)
Tooling/fixtures, sample run, FAIR/CMM as needed.
Production (Ongoing)
In-process QA, pre-ship inspections, photo/video proof.
Scale & Dual-Source
Lock in capacity; add a backup plant if needed.
What to Include in Your RFQ
Send these along and we'll return a 48-hour landed-cost model and a vetted factory shortlist.
- Drawings (PDF + STEP/IGES), tolerances & finish notes
- Target price (if you have one), demand forecast (MOQ/EAU)
- Critical features, gauge & alloy, hardness, weld specs
- Packaging/labeling, QA docs needed (FAI/PPAP/CMM), ship-to ZIP
Case Studies
Real results from founder-led brands we've helped source, scale, and ship.
Global Sourcing Locations
We connect businesses to vetted manufacturers in the world's most important supply-chain hubs. Each region has unique strengths, and we help you navigate them.
Frequently Asked Questions
Pick an Open Slot Below
Book a free 30-minute call with our sourcing team, no commitment required. We'll review your product, map a tariff-aware landed cost, and show you which vetted factories fit your specs and budget.








